# Non-Interactive Onchain Protocol
|
|
|
|
# Table of Contents
|
|
|
|
* [Abstract](#abstract)
|
|
* [General Requirements](#general-requirements)
|
|
* [Fee-Bumping Policy](#fee-bumping-policy)
|
|
* [Funding Phase](#funding-phase)
|
|
* [Execution Phase](#execution-phase)
|
|
* [Reorgs](#reorgs)
|
|
|
|
## Abstract
|
|
|
|
DLCs allow two parties to conduct stateful bitcoin contracts by giving each
|
|
other a *counter-signed set of CETs*.
|
|
These CETs all spend the same output from a funding transaction and thus only one
|
|
CET can be confirmed.
|
|
A single CET is finalized when an outcome is signed by a previously chosen set of oracles.
|
|
|
|
The contract is established once funding transaction signatures have been exchanged.
|
|
From that point on each party should assume their counter-party is non-cooperative and should ensure either
|
|
confirmation of the funding transaction or else double-spend its collateral inputs to avoid exploitation.
|
|
|
|
Once funding transaction signatures are exchanged, DLC parties aren't required to interact anymore.
|
|
There are three scenarios to consider:
|
|
|
|
1. The funding transaction doesn't confirm, and so a party must either bump its fee-rate to confirm
|
|
before the earliest DLC maturation or else double-spend its funding collateral canceling the DLC.
|
|
* Child Pays For Parent (CPFP) with BIP 125 Replace by Fee (RBF) enabled is used for fee bumping.
|
|
2. The funding transaction confirms, and the oracle releases the outcome signature, so a
|
|
participant must broadcast the CET corresponding to the oracle outcome.
|
|
3. The funding transaction confirms, and the oracle doesn't release an outcome signature
|
|
before the `refund_locktime`, so a party must broadcast the refund transaction.
|
|
|
|

|
|
|
|
# General Requirements
|
|
|
|
A DLC client should have censorship-resistant access to the blockchain, use a
|
|
local fee-estimator and ensure it is well-connected to the tx-relay network.
|
|
|
|
We recommend that clients should register no callbacks on mempool events as doing so may be a source of
|
|
cross-layer mapping. <sup>[Cross-layer Mapping](https://arxiv.org/pdf/2007.00764.pdf)</sup>
|
|
|
|
We recommend that clients should not produce local (non-adaptor) signatures for CETs until they are about
|
|
to be broadcast in order to avoid their misuse in case of site compromise, assuming an external signer.
|
|
|
|
Furthermore, we recommend duplicated backups of counter-party signatures be stored to avoid relying on
|
|
honest counter-party behavior in the case of primary storage failure.
|
|
|
|
Transaction finalization does not imply a mandatory key material access. [ FIXME: Client Key Management. ]
|
|
|
|
# Fee bumping policy
|
|
|
|
A state machine following on-chain events must take actions based on different clocks parameterized by three
|
|
values: `congestion_bump_frequency`/`security_bump_frequency`/`funding_security_point`/`refund_security_point`.
|
|
These values' definitions and setting recommendations are laid out in this section and their usage is made
|
|
more precise in following sections.
|
|
|
|
A `security_point` is a client-side heuristic time/block-stamp after which the confirmation of a corresponding
|
|
transaction is a matter of contract safety.
|
|
If confirmation does not occur soon after this point, the user can be vulnerable to a malicious double-spend if either
|
|
the outcome odds change or an oracle signature is released.
|
|
The `funding_security_point` is determined as a function of the earliest possible event signing time, which may be static or dynamic.
|
|
The `refund_security_point` is determined as a function of the user's trust towards the oracle.
|
|
We defer the exact determination of `security_point`s to the client.
|
|
|
|
If the `security_point` time is static (block height, epoch) or predictable, we recommend setting
|
|
`security_point`s to have a confirmation buffer of 20 blocks from that time.
|
|
|
|
A client's `congestion_bump_frequency`/`security_bump_frequency` can be scheduled on at least three
|
|
different kinds of events:
|
|
|
|
- a block height
|
|
- a local clock
|
|
- an observed fee-rate fluctuation
|
|
|
|
Note that these criteria may be observable by an adversary and we recommend for implementations
|
|
to pad any criteria with a random delay to diminish the risks of tx-relay jamming.
|
|
|
|
We don't provide recommendations for the `congestion_bump_frequency` as its settings depends on user
|
|
liquidity preferences and the availability of local data to predict the fee-rate.
|
|
Confirmation of non-time-sensitive transactions should happen eventually, but a user may prefer to delay
|
|
confirmation in the case of mempool-congestion.
|
|
|
|
We recommend a `security_bump_frequency` of 1 block, preferably with a fast-confirmation fee-rate as reported
|
|
by a fee-estimator if possible.
|
|
This recommendation is made because any transaction under this fee-bumping policy has a time-sensitive confirmation.
|
|
|
|
Having different fee-bumping frequencies for congestion and security avoids a client overpaying in
|
|
fees in the case of mempool spikes, while anticipating that at some point during DLC execution, the
|
|
confirmation of certain transactions is a security concern.
|
|
|
|
# Funding Phase
|
|
|
|
A DLC participant always begins the protocol in the funding phase.
|
|
The funding phase can terminate either to the execution phase by a transition to the execution phase or to an abort.
|
|
|
|
## Requirements
|
|
|
|
A node:
|
|
|
|
- if all counter-party CET and funding signatures are received:
|
|
- MUST finalize the funding transaction with a local `SIGHASH_ALL` signatures
|
|
- MUST broadcast the funding transaction
|
|
- MUST start a fee-bumping timer of length `congestion_bump_frequency`
|
|
|
|
A node:
|
|
|
|
- if a funding signature has been sent or a funding transaction broadcast and there is no confirmation:
|
|
- if `congestion_bump_frequency` expires:
|
|
- MUST spend the change output with a CPFP increasing package fee-rate to shorten confirmation time
|
|
- MUST replace the CPFP transaction according to BIP 125
|
|
- MUST reschedule timer for next bump
|
|
- if `funding_security_point` is reached:
|
|
- MUST spend a funding input with a higher-fee-rate transaction/absolute fee than any previously propagated package fee-rate
|
|
- MUST start a fee-bumping timer of length `security_bump_frequency`
|
|
- MUST disable `congestion_bump_frequency` timer
|
|
- if `security_bump_frequency` expires:
|
|
- MUST spend a funding input with a higher-fee-rate transaction/absolute fee than any previously propagated package fee-rate
|
|
- MUST replace the CPFP transaction according to BIP 125
|
|
- MUST reschedule timer for next bump
|
|
- MUST NOT spend more in bumping fees than its collateral input value
|
|
- if outcome odds are unfavorable:
|
|
- MAY disable funding fee-bumping
|
|
|
|
A node:
|
|
|
|
- if the funding transaction confirms:
|
|
- MUST track spend of the funding output
|
|
- MUST advance its off-chain state to the execution phase
|
|
- MUST note its change output for later spend
|
|
|
|
A node:
|
|
|
|
- if a counter-party funding input double-spend confirms:
|
|
- MUST abort the DLC and prevent further interactions with that counter-party
|
|
|
|
## Rationale
|
|
|
|
The funding transaction must be confirmed to consider the off-chain state initialized.
|
|
As mempool congestion may fluctuate between fee negotiation and transaction propagation, parties
|
|
must unilaterally adjust the package fee-rate (using CPFP) according to their confirmation preferences.
|
|
A party may choose to wait for mempools to drain before adjusting the fee-rate to avoid over-paying in
|
|
fees seeing as the block height of a transition to the execution phase doesn't matter, so long as it's
|
|
before the earliest possible (expected) contract execution.
|
|
|
|
As the earliest possible (expected) contract execution approaches, the funding transaction must
|
|
be confirmed quickly as a matter of security.
|
|
After the oracle releases a signature, a malicious party could try to double-spend an unconfirmed funding
|
|
transaction to avoid losing their collateral without the use of deceitful cooperation with the oracle.
|
|
|
|
In the case that a counter-party double-spends a funding input, cleaning off-chain state prevents
|
|
further exploitation at this level.
|
|
For example, a DLC implementation that has received _correct_ signatures but where the contract is
|
|
invalid could still be displaying incorrect information to the user.
|
|
A double-spending counter-party is "breaking" the previously negotiated DLC that has been agreed to
|
|
by its signature exchange.
|
|
Thus further interactions should be avoided with this buggy/malicious peer.
|
|
|
|
# Execution Phase
|
|
|
|
The execution phase transitions to the terminal phase by confirming either a CET or a refund transaction.
|
|
|
|
## Requirements
|
|
|
|
A node:
|
|
|
|
- if an oracle signature is received:
|
|
- MUST finalize the CET with a local `SIGHASH_ALL` signature
|
|
- MUST broadcast the CET
|
|
- MAY spend its outcome output with a CPFP increasing package fee-rate to shorten confirmation time
|
|
- if the CET is not confirmed and `refund_locktime` is 20 blocks ahead of local tip:
|
|
- MUST spend its outcome output with a CPFP increasing package fee-rate to shorten confirmation time
|
|
- MUST rebroadcast the CET
|
|
- MUST start a fee-bumping timer of length `security_bump_frequency`
|
|
- if `security_bump_frequency` expires:
|
|
- MUST spend the change output with a replacing CPFP increasing package fee-rate to shorten confirmation time
|
|
- MUST replace the CPFP transaction according to BIP 125
|
|
- MUST reschedule timer for next bump
|
|
- MUST NOT spend more in bumping fees than its outcome value
|
|
- MAY NOT spend more in bumping fees than its outcome value - refund value if the oracle is trusted
|
|
- if the outcome realization is unfavorable:
|
|
- MAY disable CET fee-bumping
|
|
|
|
A node:
|
|
|
|
- if a CET confirms:
|
|
- MUST note its outcome output for later spend
|
|
- MUST advance its off-chain state to the terminal phase
|
|
|
|
A node:
|
|
|
|
- if no oracle signature has been received and `refund_locktime` is reached:
|
|
- MUST finalize the refund transaction with a local `SIGHASH_ALL` signature
|
|
- MUST broadcast the refund transaction
|
|
- if the refund is not confirmed after `congestion_bump_frequency`:
|
|
- MUST spend the change output with a CPFP increasing package fee-rate to shorten confirmation time
|
|
- MUST start a fee-bumping timer of length `refund_congestion_bump_frequency`
|
|
- if `refund_congestion_bump_frequency` expires:
|
|
- MUST spend the change output with a replacing CPFP increasing package fee-rate to shorten confirmation time
|
|
- MUST replace the CPFP transaction according to BIP 125
|
|
- MUST reschedule timer for next bump
|
|
- if `refund_security_point` is reached:
|
|
- MUST spend a funding input with a higher-fee-rate transaction/absolute fee than any previously propagated package fee-rate
|
|
- MUST start a fee-bumping timer of length `security_bump_frequency`
|
|
- MUST disable `refund_congestion_bump_frequency` timer
|
|
- if `security_bump_frequency` expires:
|
|
- MUST spend a funding input with a higher-fee-rate transaction/absolute fee than any previously propagated package fee-rate
|
|
- MUST replace the CPFP transaction according to BIP 125
|
|
- MUST reschedule timer for next bump
|
|
|
|
A node:
|
|
|
|
- if a refund transaction confirms:
|
|
- MUST note its outcome output for later spend
|
|
- MUST advances its off-chain state to the terminal phase
|
|
|
|
|
|
## Rationale
|
|
|
|
As `refund_locktime` approaches, a CET must be confirmed quickly as a matter of security.
|
|
A malicious party could try to cancel an unfavorable DLC by confirming the refund transaction.
|
|
|
|
A refund transaction confirmation is less sensitive but it should be noted that while participants are
|
|
waiting for refund confirmations, the oracle key material is toxic.
|
|
In case of oracle key compromise, a CET could be signed and confirmed by a malicious counter-party.
|
|
Refund transaction confirmation should be managed as a function of the user's trust towards the oracle.
|
|
|
|
# Reorgs
|
|
|
|
Reorgs must be handled by clients as they are a source of funds loss in case of mishandling.
|
|
|
|
## Requirements
|
|
|
|
A node:
|
|
|
|
- if a funding transaction is disconnected
|
|
- MUST roll back its state to funding phase starting
|
|
- if a CET or refund transaction is disconnected
|
|
- MUST roll back its state to execution phase starting
|
|
|
|
|
|
# Authors
|
|
|
|